DisgrifiadBlaen Bowi wind farm comprises of three, 1.3 MW wind turbines on Moelfra Hill, 3 miles south of Newcastle Emlyn. In 1995 a 25 year lease was entered into by the owner of Blaen Bowi farm and Windjen Power Ltd. The turbines became operational in July 2002.
Photographed during aerial reconnaissance by RCAHMW, 11th Sept. 2007.
L Osborne. 12th Nov. 2010.