Description1. Maerdy Windfarm is an eight turbine windfarm at the top of the Rhondda Valleys. The project was built during 2012-13 and commenced commercial operations in August 2013.
2. Recorded during RCAHMW aerial reconnaissance under construction on 28th November 2012.
T. Driver, RCAHMW, 2016