Part of extraction site (NPRN 500868), the quarry pit is 20 m long, 8 m wide and 2 m deep. The quarry is partly filled in by material supporting metaled road (NPRN 500881). Methodology: 30 m transect survey. Positional accuracy: less than 10 m. Tolerance of accuracy: +/- 5m. K. Laws, EAS Ltd, 22/11/2007.