Nid oes gennych resi chwilio datblygedig. Ychwanegwch un trwy glicio ar y botwm '+ Ychwanegu Rhes'

Manchester and Milford Railway; Aberystwyth to Pencader, Penpontbren to Llangurig

Loading Map
NPRN91660
Cyfeirnod MapSN43NW
Cyfeirnod GridSN4460036740
Awdurdod Unedol (Lleol)Carmarthenshire
Hen SirSir Gaerfyrddin
CymunedLlanfihangel-ar-arth
Math O SafleRHEILFFORDD
CyfnodÔl-Ganoloesol
Disgrifiad
The southern section of the Manchester and Milford Railway opened throughout on 12 August 1867 from Pencader Junction (SN 4460 3674) to a terminus (SN 5855 8152) in Aberystwyth station (nprn 34676). It closed between Aberystwyth and Strata Florida station (nprn 41349) due to flooding at Llanilar on 14 December 1964; closed officially between Aberystwyth and Pont Llanio (nprn 41351) on 22 February 1965; closed between Pont Llanio and Aberaeron Junction 30 September 1970; closed between Aberaeron Junction and Carmarthen 1973.
The northern section of the railway (see nprn 410211) was built between Penpontbren Junction (nprn 301485) and a point about 1km to the west of Llangurig Station (nprn 404402) at SN 8994 8017. It was not opened for regular traffic; the track was lifted and the route abandoned in the late nineteenth century. A tunnel, 2km long, was planned to carry the railway from the Wye valley, west of Pant Mawr, to the Myherin valley and on towards Devil's Bridge; evidence of the approach cuttings is believed to be visible at SN 8167 8160 (northeast end) (nprn 406893) and SN 7996 8031 (southwest end) (nprn 406894); however, at both these locations the likely earthworks shown on the first edition OS 6in map are marked as 'Old Quarry'.
B.A.Malaws, RCAHMW, 04 February 2010.